EDMADESIGN · TECHNOLOGY · LIVING
Concept image of a contemporary prefabricated home with energy equipment
EDMA

EDMA
ECO MODULAR

Smart, sustainable prefabricated homes

Modern modular construction. Sustainable materials. Factory-prepared Smart Home systems. Efficient, precise assembly.

Sustainable
materials

Prefabricated
approx. 4 × 6 m modules

Integrated
Smart Home

Energy
efficiency

TECHNOLOGY

A new generation of modular homes

EDMA ECO MODULAR is a concept for prefabricated homes based on welded steel frames and lightweight, sustainable dry-build partitions. Our goal is to prepare building services in a controlled factory environment and connect finished modules on site.

Concept image of a steel-framed prefabricated module in a factory
Conceptual cross section of a prefabricated dry-build wall
SUSTAINABLE MATERIALS

Better homes for people and the planet

We are developing dry-construction solutions using materials with a lower environmental impact. Wall build-ups, thermal performance and material certification will be specified and verified during detailed design.

STREAMLINED ASSEMBLY

From production to installation

Our concept uses modules approximately 4 × 6 metres in external dimensions, with prepared electrical, ventilation and plumbing systems and Smart Home connection points. Installation schedules depend on each project's design, transport and site conditions.

Concept image of transporting and installing a modular home unit
INTELLIGENT LIVING

Smart Home from day one

Automation and cabling are planned as part of each module. This approach is designed to reduce later alterations and simplify integrated control of lighting, indoor climate and selected home functions.

EDMA ECO MODULAR

Explore the future of modular construction

EDMA ECO MODULAR is in the technology development and production planning phase. This page presents our vision for sustainable steel-framed modular homes with factory-prepared Smart Home systems.

The images are concept visuals. Technical specifications, performance data and delivery timelines must be confirmed for each project.